You don't have javascript enabled. Good luck with that.
Pencarian
Satu Trainset Kereta MRT Jakarta Akan datang di Awal 2018

Jakarta MRT Train will Be Shipped in Early 2018

The shipment will be done gradually from end of February to March 2018

PT. Mass Rapid Transit (MRT) Jakarta is targeting to send one set of train in early 2018.

PT. MRT Jakarta President Director, William Sabandar said one set of train would be sent to Jakarta by sea shipment. One set of train consists of six cars that can transport up to 1,900 passengers.

BUMD Requested to Use PMD Effectively

"The shipment will be done gradually from end of February to March 2018," he mentioned, Tuesday (12/5).

About rolling stocks, he added, 96 units have been made by Japan Company, and will be tested in Japan this month. Those are realized through employment contract of CP-108 (Sumitomo Corporation) in the amount of Rp 145.5 billion.

Rolling stock is made from stainless steel material with blue modern package in most of train surface.

"Rolling stock uses a well quality material," he explained.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1581 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1438 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1302 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1095 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye966 personDessy Suciati